Most residential bored piers in Melbourne are between 1.5 and 4 metres deep, but there is no fixed rule — the exact depth is set by a structural engineer based on a geotechnical soil report and the site’s classification under AS 2870-2011. On sites with uncontrolled fill or soft ground, piers can extend to 6 or 8 metres. Depth cannot be determined without a soil report. Contact Roniak Group on 0412 209 069.
Short answer: most residential bored piers in Melbourne land somewhere between 1.5 and 4 metres. But that range is a description of what usually happens, not a rule. Your engineer sets the depth from your soil report, and on filled or soft ground it can run to 6 or 8 metres. Two houses on the same street can end up with very different pier depths for perfectly good reasons.
If you have just been handed a set of engineering drawings calling for deeper piers than you expected, this explains where that number came from.
Depth Follows the Soil, Not the House
Most people assume pier depth scales with the size of the building. It doesn’t. A modest single-storey house on badly behaved ground will need deeper piers than a bigger house sitting on good ground.
What actually sets the depth is one question. How far down do we go before we hit material that will carry this load and stay put?
Across much of Melbourne, and especially through the west and north, the answer is governed by reactive clay. These soils take up moisture over winter and swell. They dry out over summer and shrink. The movement is seasonal, it is significant, and it never stops. Anything founded inside that zone moves with it, and because the movement is never uniform under a whole building, one corner lifts while another settles. That differential movement is behind a large share of the cracked cornices and sticking doors you see in older Melbourne homes.
A bored pier gets around the problem by going straight through the moving layer and bearing on material underneath that stays where it is. We have written separately about why reactive soil makes bored pile foundations the default answer here.
The Document That Sets the Number
Everything starts with your site classification under AS 2870-2011. It grades residential sites by how reactive the soil is.
| Class | Soil Behaviour | Typical Effect on Pier Depth |
|---|---|---|
| A | Stable sand or rock, minimal movement | Piers often unnecessary; shallow footings may do |
| S | Slightly reactive clay | Shallower piers, lower end of the range |
| M | Moderately reactive clay or silt | Mid-range. Very common across Melbourne |
| H1 / H2 | Highly to very highly reactive clay | Deeper piers, heavier reinforcement |
| E | Extremely reactive | Deepest piers, most substantial design |
| P | Problem site: fill, soft soil, landslip, mine subsidence | Depth set by the problem layer, which can be metres thick |
Class P is the one that catches people out, because it doesn’t describe reactivity at all. It says the site has a problem that has to be engineered around. In Melbourne that usually means uncontrolled fill left behind by earlier site works. On a P site your piers have to pass through every bit of that fill and found in the natural material beneath it, and nobody knows how deep that is until someone drills.
The classification comes out of a geotechnical report. That is why no contractor can give you a pier depth over the phone. It isn’t evasiveness. The information genuinely does not exist yet.
Six Things That Push Depth Down
- Reactive clay. The pier has to clear the seasonal moisture zone completely, not most of it.
- Fill. Uncontrolled fill has no dependable bearing capacity, so the pier goes through all of it.
- Structural loads. Two storeys carry more than one. Heavier loads mean deeper piers, wider ones, or more of them.
- Trees. A mature gum draws moisture out of clay across a surprisingly wide radius, which deepens and intensifies the drying zone. Removing one causes the opposite problem: the soil rehydrates and swells for years afterwards.
- Slope. On a sloping block each pier along the same footing line may need a different depth to reach the same stratum, so depths vary across one house.
- Nearby excavation. A neighbouring basement or a deep cut close by can change ground conditions and the design response to them.
Why Your Neighbour’s Piers Are Shallower
This question comes up on almost every job. There are usually straightforward answers.
- Their house predates the current standard and was built under different requirements
- Their block was never filled and yours was, or the other way around
- Their loads are lighter. Single storey rather than double, lightweight cladding rather than brick
- They have no large trees and you have three
- The soil profile actually changes across a street, particularly near old creek lines and former quarry ground
If a design looks unusual to you, ask your engineer to walk you through the borehole logs. Any good engineer will show you the layer they are founding on and why they chose it. What you should never do is ask a contractor to install shallower piers than the drawing specifies. The engineer carries the design liability, the contractor builds to the drawing, and a pier that stops short of the founding layer does very little for anybody.
Depth Gets Confirmed on Site, Not on Paper
The design depth is a prediction drawn from a handful of boreholes. What is actually under your house only becomes clear once drilling starts.
In practice the driller logs what comes out of each hole and at what depth. Where the material differs from what the geotechnical report predicted, the engineer gets a call and the pier may go deeper. This is normal, and it is one of the reasons bored piers suit variable ground so well. Each pier can be adjusted on its own as the ground reveals itself.
It is also why installation records matter under AS 2159-2009. When the job is finished you should receive pile positions, depths achieved, the founding material recorded at each one, and concrete volumes. Your engineer signs off against that record, and a future buyer’s building inspector will ask for it. A contractor who doesn’t produce one has left you with nothing to verify.
Diameter and Depth Are Designed Together
Depth isn’t the only lever. A pier carries load two ways: end bearing at the base, and friction along the shaft. So a wider pier at a shallower depth can sometimes do the same job as a narrower, deeper one.
Which combination your engineer picks depends on the soil profile and on what is practical. A rig that fits down the side of your house has diameter limits, and sometimes those limits shape the design. Residential piers commonly sit in the 300mm to 600mm range. Basement and commercial work goes substantially larger.
Once the piers are in, they are usually tied together at the top by a capping beam, which spreads load between them and gives whatever sits above a single continuous element to bear on.
What to Do With All This
If you are at the front end of a project, the order is simple. Get the geotechnical report first. It is the cheapest document in the whole process and it drives the most expensive decisions. Hand it to your structural engineer, who specifies depth, diameter, reinforcement and spacing. Then hand both documents to your piling contractor, who can finally quote against a real design instead of a guess.
Anyone quoting a pier depth before that report exists is estimating, and the estimate will move.
Talk to Roniak Group
Roniak Group installs bored piers and pile foundations across Melbourne for residential, townhouse and commercial projects. We work to AS 2159-2009 and hand over installation records on completion. Send through your engineer’s drawings and geotechnical report and we will come back with a written quotation.
Request a quote · or call 0412 209 069 · Keysborough VIC
Frequently Asked Questions
How deep do bored piers need to be in Melbourne?
Most residential bored piers fall between roughly 1.5 and 4 metres, but the depth is specified by a structural engineer working from the geotechnical report. On sites with deep fill or soft ground, piers can extend well beyond that range.
What determines bored pier depth?
The depth required to pass through unstable or seasonally moving ground and found in material that will carry the load. Site classification under AS 2870-2011, structural loads, fill depth, nearby trees and slope all contribute.
What is a Class P site?
A site with a problem requiring specific engineering, most often uncontrolled fill, but also soft soil, landslip or mine subsidence. Piers must pass through the problem layer entirely and found in the natural material beneath it.
Why are my piers deeper than my neighbour’s?
Common reasons include a different soil profile, fill on one block and not the other, heavier structural loads, nearby trees drawing moisture from the clay, or an older house built under earlier requirements.
Can pier depth change during construction?
Yes. Design depth is predicted from boreholes. If drilling reveals different material, the engineer is consulted and piers may be taken deeper. Each pier can be adjusted individually.
What diameter are residential bored piers?
Commonly between 300mm and 600mm, with larger diameters used on basement and commercial work. Diameter and depth are designed together because a pier carries load through both end bearing and shaft friction.
Do I need a soil test before piers can be designed?
Yes. Pier depth cannot be determined without a geotechnical report classifying the site and describing the soil profile with depth.
What records should I receive after piling?
Under AS 2159-2009, installation records should include pile positions, depths achieved, founding material encountered and concrete volumes.